Downtown pipe deteriorating

By Nathan Pipenberg

An old storm water drainage system underneath Atherton Street is deteriorating, prompting questions of who should repair the pipe system as local officials believe fixes will have to be made soon.

In the past, municipalities and townships have been responsible for repairing storm water systems, and this system runs through five–Patton, Ferguson, College, and Harris Townships as well as the State College Borough.

But since PennDOT is responsible for maintaining the road above this pipeline — Atherton Street — Council of Government (COG) officials have been debating how best to persuade PennDOT to pick up the tab for the repairs, which could potentially cost $15 million, according to the municipalities’ Public Works departments.

Since damages to the storm water system will also damage Atherton Street, PennDOT will have to become involved whether they take charge of the pipe repair or not.

Centre Regional Planning Agency Transportation Planner Tom Zilla said the idea is to “coordinate the two efforts” so that repairs to both the pipes and the road happen at the same time. He also said the easiest way to do that is to have PennDOT take over the entire project.

While there haven’t been many proven damages to Atherton Street on account of the storm water system, recent repairs under a bike path in Harris township proves that the corrugated metal pipes are weakening. The bike path runs along S. Atherton Street and above a part of the pipe system that was corroded and full of holes. The repairs cost $300,000.

The issue will continue to be discussed at this month’s COG General Forum meeting.

Read more here: http://www.collegian.psu.edu/archive/2010/06/07/downtown_pipe_deteriorating.aspx
Copyright 2026 Daily Collegian