Construction for the new DeKalb high school is thus far under budget and on time for its expected opening in Fall 2011.
Russ Fletcher, Director of School and Community Relations for District 428 said at this point, a little over 50 percent of the expenditures and construction have been completed on the new high school, located on Dresser Road. Of an $88 million budget for the new school, the project has so far used $66 million.
“When you drive by the new school, you will be able to see most of the walls up,” said District 428 Superintendent Jim Briscoe. “The whole building will be enclosed by the fall, during which you will be able to see turf on the field and the outdoor track. During the winter we will be working on the interior of the building and by late spring, furniture will be brought in.”
The new high school building is being built as a result of a passed referendum in February 2007. According to Briscoe, the main reason a new high school was needed was because of overcrowding.
There are currently 1,740 students in the high school, which is about 300 over the maximum capacity of the building, said Doug Moeller, DeKalb High School Principal. The new building will hold 2,000 to 2,500 students.
A lack of hall space and minimal cafeteria room created congestion and security problems for the school. During passing periods students are at a standstill and juniors and seniors currently have open campus during lunch periods, Moeller said, which creates security and safety issues.
“The current high school building is a good building, it just doesn’t accommodate for the number of students we have,” Moeller said. “The new building will have wider halls and larger staircases. It will be a greater asset for not only the school but for the whole community.”
The new school will provide more flexibility in scheduling classes, more computer labs and additional modern technology. Currently, students receive little computer time and the computer labs are booked for weeks in advance, Moeller said.
“The new high school will have an up-to-date fine arts department and fine arts theater, as well as updated technology and the ability to lock down the academic part of the building,” Briscoe said. “The school will also include a field house with four gyms and an indoor track.”
After the high school is built in Fall 2011, all DeKalb high school students will attend the new building on Dresser Road. Huntley Middle School students will then attend the current high school building located 1515 South 4th St., and Wright Elementary students will attend the current Huntley Middle School building located at 821 South 7th St. Malta Elementary students will attend the current Wright Elementary building at 5068 Illinois Route 38 in Malta.
Some renovation work at the current Huntley Middle school will take place in the fall. The majority of renovations for Huntley Middle School, the current DeKalb high school facility and Clinton Rosette Middle School will be completed in 2011, Fletcher said.
“It is going to be a challenge to make all these moves in the Fall of 2011,” Briscoe said. “But the current high school is going to be a great middle school that can provide great learning opportunities for the students.”
When the construction of the high school is finished, a ribbon cutting ceremony will take place in front of the community.
“We want the whole community to feel part of the school since they were the ones who supported it,” Briscoe said.