How Civil Engineers Can Plan Wastewater Infrastructure for Phased Developments 

Originally Posted on Daily Emerald via UWIRE

The best phasing plans build the pieces that are hard to revisit early and add treatment capacity as development actually arrives

By using a phased approach, both the wastewater flow anticipated from the first occupants and the flow at full buildout are shown on the same drawing. If all of the pipes and treatment units required for the final phase are constructed on day one, the owner may end up with unused capacity for many years. Alternatively, if the design is only done for the initial phase, then the following expansion could require cutting through already finished roads or involve having to find a second site for a plant.

The role of the civil engineer is to divide the project into parts that must be ready early and parts that may be delayed. The decisions involved go beyond just the projected flow; road timetables, the availability of land, permit restrictions, and the time required to install the equipment all influence which items should be constructed in each stage.

A project involving 1,200 homes could open its first 300 homes many years before the rest of them. However, that doesn’t imply that the entire wastewater system should be constructed to serve 300 homes. Since a sewer under a future road would be costly to replace, it might be reasonable to install it at full capacity from the beginning. Treatment equipment, by contrast, could be added as more homes become connected. The appropriate timing will depend on the cost and the level of disruption involved in expanding each component.

If you plan to connect the project to the public sewer, you should speak to the utility company before finalizing that plan. It’s possible that a main sewer nearby could still be supplying pump stations or treatment works which are close to their capacity. Find out what the current capacity is and whether any upgrades are intended.

The Pipes and the Plant Age Differently

Before determining which sewers to construct at this stage and which to put off until later, it is necessary to trace the sewer route over the entire site plan. You should examine where the pipes, easements, utility crossings, and pump stations are located and see how the route changes when new parcels are acquired. It can be expensive to move a sewer once the roads and buildings have already been constructed. If the cost of installing a larger main line in the first phase is only a little higher, it may be worthwhile doing so at that stage. However, increasing the size of every pipe can cause problems since low flows in an oversized pipe may result in the accumulation of sediment and other operational issues.

It is often possible to add treatment equipment in stages, on the condition that there is space available in the original plant layout. This implies that planning should extend beyond the next basin or process unit; you should check whether the headworks, disinfection system, solids handling, electrical supply, and outfall can accommodate the subsequent expansions. Space must be left for any new equipment, and a decision has to be made as to how the crews will connect it while the plant remains in operation.

Flow assumptions must be based on the land use schedule rather than merely on the final number of lots; it is necessary to indicate when houses are expected to be occupied and when commercial or industrial areas might connect, since the wastewater strength in such cases can be different from that of residential flow. The average flow should be separated from the peak flow, and the infiltration and inflow allowances required by the reviewing authority should be included. According to the EPA’s design guidance for treatment upgrades, the design inputs include the projected flow and loading, the effluent requirements, and the future operating conditions.

Design for Flow, Loading, and Permits

A forecast is only an estimate and not a commitment. It is necessary to examine a more gradual buildout as well as the developer’s preferred timetable. In the event that a tenant delays or if the sale of homes takes longer than anticipated, the treatment plant could end up operating well below its designed flow rate. Conversely, if a major commercial user turns up earlier than expected, the loading might increase more rapidly than the residential forecast indicates. The phased approach should clearly state which of the assumptions could affect the design.

Permits can have as great an effect on phasing as concrete and pipe; find out who will be responsible for reviewing the project, what discharge limits apply, and whether any expansion will need a modification to the permit or a new approval. In cases where the project is discharging under an NPDES permit, EPA’s municipal wastewater permitting overview sets out the permit limits and conditions applicable to treatment facilities. Requirements from the state and from local authorities may also apply.

Wet weather flow should be looked at in detail. If sewers are cracked or not well sealed, they can take in groundwater and stormwater. Even when normal flow levels are low, the resulting surges may cause operational difficulties. The EPA considers both infiltration and inflow to be factors that lead to overflows and treatment problems. Keep stormwater out of the sanitary sewers and, where local flow data are available, use them rather than assuming the system will carry only domestic flow from the new development.

Set the Expansion Trigger Before Construction

Work will move to the next stage when certain conditions have been met; these conditions might include a specific number of homes being occupied, the installation of new service connections, a measured flow of water, or the acquisition of a permit. However, whatever the criterion is, sufficient time must be allowed for the design process, for obtaining the necessary approvals, for placing orders for the equipment, and for the actual construction. If the team does not start until the plant is almost full, there could be insufficient time to increase its capacity before it is required.

The number of homes on its own can be misleading when the site is used for a variety of purposes. For example, in a development with 100 homes, a small number of commercial or industrial users could make up a large portion of the wastewater discharge. In such a case, you should include in the forecast the expected flow and wastewater strength of those users.

In cases involving a gradual increase in demand, leasing a wastewater treatment plant can help ensure that the available capacity corresponds to the construction timetable. When examining the lease terms, it is necessary to look at the design as well: specifically, the amount of capacity on offer at the beginning, the method of expansion, who is responsible for operations and maintenance, and what takes place when the lease comes to an end. The lease agreement must be compatible with the project’s permits and long-term plans.

A good phasing plan specifies what will be carried out in the first stage, what can be postponed, and when it is time to expand. This enables the owner to know exactly what their next step should be if construction or occupancy progresses faster or slower than anticipated.

The post How Civil Engineers Can Plan Wastewater Infrastructure for Phased Developments  appeared first on Daily Emerald.