Expect to see major Eddy Hall renovations starting in November

Originally Posted on The Minnesota Daily via UWIRE

For the past 15 years, the crimson brick building situated on the northern edge of the University’s Old Campus Historic District has sat empty, lacking much attention from passersby.

In the coming weeks, this is expected to change. This November, the building is scheduled to begin a major two-year renovation process.

Constructed in 1886 as the Mechanic Arts building, Eddy Hall stands as the oldest building on the University campus.

The building became unusable and has sat vacant for more than a decade, primarily due to inadequate and unstable infrastructure as well as an unsuccessful restoration attempt from a 2012 state bonding bill snub.

Under President Rebecca Cunningham, the institution will allocate a portion of its capital investment initiative to cover approximately two-thirds of the total $33 million project cost. 

The remaining expenses will be covered through collegiate resourcing and philanthropy from the College of Education and Human Development, as their programs are set to be hosted in the building following the completion of the renovations.

These programs will include CEHD’s Educational Opportunity Student Service Center, Common Grounds Consortium, FirstGen Institute and TRIO.

Rashné Jehangir, the assistant dean of education opportunity programs in CEHD, said the renovations will aid in building better environments for students.

“While TRIO and our Education Opportunity Programs have been on this campus since 1968, they have rarely occupied spaces where the entire design is student-centric, communal and designed with their needs in mind,” Jehangir said.

Jehangir said the updated space is an integral aspect of student wellbeing, and an investment in the future of academia on campus.

“This building, while honoring history, is really living into what the future of higher education can look like when spaces are designed for the needs of today’s students, including our transfer and commuter students,” Jehangir said. 

University Regent James T. Farnsworth said although the Board does not directly control specific initiatives, they do help with the oversight of capital improvements and project planning.

Farnsworth commended the upcoming renovation and said it will work to greatly improve the livelihoods of students and faculty in the coming years. Additionally, he said this project is meaningful to the community due to the efforts that have been put into it over the past decade and voiced his enthusiasm to see how the renovations develop.

“I think the renovation is really important because it’s been a long time coming,” Farnsworth said. “It’s a critical building in the core of our Twin Cities campus – I’m really excited to see the plans come to fruition.”

Reminiscent of its time, Eddy Hall’s distinct nineteenth-century Queen Anne-style architecture aims to be preserved on the building’s exterior. However, the interior will face more modernized refurbishment.

Alice Roberts-Davis, vice president for University Services, said almost the entire exterior requires repair or replacement, but the architecture will remain similar to its original aesthetic style.

“We are taking great care to rehabilitate and preserve the historic exterior materials,” Davis said. “The project includes replacing damaged bricks and stone, tuckpointing and replacing the roof and windows.”

In contrast, the interior is expected to receive a more modern makeover. Davis said the current condition of the internal features is insufficient to preserve.

“The interior of Eddy Hall has had many renovations and changes, has limited historic features even in satisfactory condition, and has significant building code-required updates,” Davis said.  

Davis added that these contemporary modifications will provide an opportunity to refresh and welcome students from multiple University programs. 

“With the CEHD programs moving into Eddy Hall, it is an opportunity to renovate and refresh the interior to be a very welcoming, intuitive and modern hub for student services,” Davis said.

The interior will feature new spaces including various seating areas, conference rooms and program offices, in addition to lighting, more natural light and new heating, ventilation and air conditioning systems.

The upcoming renovations are set to mark a historic and cultural shift for the University, Davis said.

“When Eddy Hall was built, only men were students in the program,” Davis said. “The renovated building will juxtapose its deep history with modern elements that serve today’s and future students.”

The post Expect to see major Eddy Hall renovations starting in November appeared first on The Minnesota Daily.

Read more here: https://mndaily.com/campus/expect-to-see-major-eddy-hall-renovations-starting-in-november/09/28/2026/eicmndaily-com/
Copyright 2026 The Minnesota Daily