On July 24, the University of Minnesota announced the closure of Bailey Hall and its dining hall for the 2026-2027 academic year.
The announcement comes after the University received $75 million in a bonding bill from the state, $35 million of which is dedicated to the construction of the new St. Paul Campus Center.
The new center is planned to replace both the Magrath Library and the current student center. In an August 2 statement, the University said the closure of Bailey Hall was a necessary step in the revitalization of the St. Paul campus.
“We remain deeply committed to supporting affected students and employees throughout the transition,” the University said. “While advancing plans for the future St. Paul Campus Center and other investments that will strengthen the student experience and serve Minnesota for generations to come,”
Third-year student Kai LaBella lived in Bailey Hall during the 2024-2025 academic year.
He is a Fisheries, Wildlife and Conservation Biology major, which has its major-specific classes in St. Paul. LaBella said that because he had classes in Minneapolis as well as St. Paul, living in Bailey didn’t make much of a difference in terms of convenience.
The University has not yet announced whether the closure of Bailey Hall is permanent or if it is only closed for renovations. The released information only states that further evaluations will be made for the future of the building.
LaBella said he was glad work was being done on the hall. During his year in Bailey Hall, LaBella estimated that the amenities were closed 80% of the year, as flooding often halted the building’s basement amenities. While LaBella said the experience of living in the hall was comfortable and that the negative generalizations of the hall were overblown, the age of the building was apparent.
“I had a friend who lived in Pioneer, I looked at theirs. I was like, ‘Oh my gosh, this thing is like a five-star hotel compared to Bailey’,” LaBella said.
Second-year kinesiology student, Quinn McKinney, who lived in Bailey Hall in the fall of 2025, said he had no complaints about the condition of the building. He did not note experiences of flooding or power outages, only citing the lack of air conditioning as something he wished for.
McKinney said Bailey Hall being connected to the St. Paul Student Center and having its own dining hall were some of the top benefits of living there.
According to a University Housing and Residential Life webpage, no first-year students who requested to live on campus will go without housing, and all confirmed roommate requests will be met. Additionally, no employees affected by the closure of the hall will be laid off, and all staff will be reassigned to other locations under the same job descriptions.
LaBella said at first he was surprised when he heard about Bailey Hall’s closure, but that it made sense when considering the work being done to the St. Paul campus.
“I was kind of shocked, but then I thought about what they’re doing to the St. Paul campus,” LaBella said. “They just got a bunch of money to renovate the library, which is now closed. They’re turning that into a student center [St. Paul Campus Center].”
The post Bailey Hall to close for the 2026-2027 academic year appeared first on The Minnesota Daily.