Autzen canal footbridge to close until April

Originally Posted on Daily Emerald via UWIRE

A small footbridge serves as the final crossing point before arriving at Autzen Staduim. The pathway students used to walk to Autzen stadium during previous football seasons is eerily empty due to the circumstances surrounding the COVID-19 pandemic. (Will Geschke/Emerald)

The Autzen Canoe Canal Footbridge will be closed for refurbishment as part of the athletics practice facility upgrades.

The wooden footbridge is the primary access to the south gate of Autzen Stadium.

The footbridge is currently closed and will remain closed until Apr. 1. The bridge will be resurfaced, aiming to create a smoother surface for walking and biking, according to an announcement from the city of Eugene.

Detours for the duration of the closure include the soft-path footbridges near Emerald Valley BMX park and Cuthbert Amphitheatre. A paved detour is available by following the signed route along MLK Boulevard and through Alton Baker Park, or go east to the bridge near the pond and follow signed detours through the park.

The Lot 8 parking lot will remain closed through August for continued improvements, according to the announcement. It will be enlarged, paved and made into an all-season parking lot.

During this time, the Alton Baker Dog Park will not be accessible
via Lot 8. The announcement suggests dog park users use the parking lot at Alton Baker Park off Club Road, or the city parking lot near the science center, and use the bridge near Cuthbert Amphitheatre.

These renovations are part of the University of Oregon’s expansion of the Hatfield-Dowlin Complex, an indoor practice facility located next to Autzen Stadium.

According to Matt Roberts, associate vice president for community relations, the refurbished footbridge will “enhance connectivity and accessibility” for the Eugene community and ensure the space remains “welcoming and functional” year-round.

Updates on the refurbishments are available on the university’s government and community relations website.

The post Autzen canal footbridge to close until April appeared first on Daily Emerald.

Read more here: https://dailyemerald.com/181236/news/autzen-canal-footbridge-to-close-until-april/
Copyright 2026 Daily Emerald