Starbucks renovation

Originally Posted on The Hartford Informer via UWIRE

As the year is coming to a close there has been exciting news surfacing about the upgrades that will be done to the Starbucks located in the Main Campus Library.

The renovations will take place this summer and will extend until it comes times for students to start moving back on to campus.

The Starbucks that has been operating on campus serves more as an express Starbucks, which means that it doesn’t serve all that a normal Starbucks does if a person where to go off campus. The new renovations will bring a fully working Starbucks to campus.

This will include all of the pastries and all of the different coffee mixes a person can find off campus.

Students will have the opportunity to even have a chance of finding more careers on campus with the renovation.

Adding a larger Starbucks takes more people to help run so there will be more job opportunities. The future of the Starbucks will be located in the same area as it now but will extend from the wall closest to the door to the main computer area.

Sketches have been released of what the area is intended to look like and the over all feel is rustic and contemporary, as you would see in other Starbucks.

For those who are interesting in looking at the future of the Main Library on campus there is a poster board showing different angles of what the renovations will look like when completed.

By completing a new full functioning Starbucks it will bring in much more money to the business ,which is needed to make this whole opperation work. Since it will have a full functionin kitchen it will require much more money to go into the project.

For this project to be successful there would have be almost double of the traffic than what is seen now.

That shouldn’t be an issue if the cafe in the end has more food and drink options for students to choose from.

Read more here: http://feedproxy.google.com/~r/HartfordInformer/~3/ahjLbeLf4Lg/
Copyright 2025 The Hartford Informer